TRAINING PENGENALAN OIL AND GAS QUANTITY ACCOUNTING SYSTEM
TRAINING PRINSIP OIL AND GAS QUANTITY ACCOUNTING SYSTEM
Instructor by: Assegaf Afianto
DESCRIPTION
In the Oil and Gas Industries, one of important activities is “To
Measure, To Calculate and To Make a report of the Final Quantity and
Quality Crude Oil, Gas Produced, Remaining Stock at the Storage Tank
or Floating Storage�, The Quantity of Crude Oil & Gas delivered for
Sales or Transfer to the next handling entity must meet the standard
condition of legitimate and formal matters within interrelated
company.
To avoid big losses of Crude Oil & Gas, remaining stock and sales
poured forth should be done using a standards form, after Crude Oil &
Gas has been Separated and Storage.
Therefore in this course we will highlight this matter to brain storm
all participants, referring Government regulations, BPMIGAS
procedures, International standard (ASTM-IP, AGA) to meet
international Oil Company Standard, and rule & Regulations.
The course also explains about how to calculate entitlement based on
PSC Contract and how to nominate and lift the entitlement from the
Terminal, base on off take Procedure.
Â
MATERI Training Oil And Gas Quantity Accounting SystemÂ
1. Production Operation and Lifting
* To understand basic philosophies how to carry out Crude Oil
Production from the producing well until point of delivery to the
third parties, in order to have knowledge for the activities of
production operations relationships to the Quantity Accounting
System activities, consist of:
* Monitoring Well Production, individual Well Test method and well
potential calculation procedure.
* To brief Flow of Production System from Production Well Head until
the point of transfer to third parties.
* Separation Process between Oil, Water and Gas at each Block
Station or Gathering Station and function of each equipment.
* Crude Oil Delivery Process Procedure to third parties
2.   Production, Stock and Lifting Reporting System
* To understand about Oil and Gas Reporting System that must be
prepare by K3S comply with a requested by Stake Holder and
Management consist of Total Production, Stock and Lifting,
include:
* Reporting of Individual Well Potential production
* Reporting of Crude Oil Production, Stock, Lifting / Distribution
and losses at “Crude Oil Production Reconciliation�.
* Reporting of Gas Production: “Gas Production and Distribution
Report�
3.  Standard Measurement and Calculation Of Oil Production and
Lifting With Static System Methode
* To give understanding and explanation Procedure measurement and
calculation of crude oil in the storage tank, where apply for
calculate total production, lifting and stock of crude oil,
consist of:
* Level and temperature measurement of fluid in the storage tank.
* Crude Oil Sample taking from inside the tank.
* Laboratory analysis to determine of Density/Specific Gravity/API
Gravity and BS&W content of the Crude Oil.
* Crude Oil Stock Calculation consists of: Step of Crude Oil Stock
Calculation, Reading of Tank Table, and Reading of ASTM – IP
Table.
4.  Standard Measurement and Calculation Of Oil Production and
Lifting With Dynamic System Methode
* To understanding the Procedure of measurement and calculation
total crude oil where flow through the pipe line By Flow Meter
(dynamic measurement), consist of:
* Explanation working system of flow meter process (PD Meter).
* Procedure of how to prove Metering System by Proper Meter.
* Calculation of measurement result by manual system.
* Standard Gas Measurement system by Orifice Meter and Gas Heating
Value Calculation.
5.  Loss Analysis
* To give knowledge about losses and gain in the production
operation process, storage handling and transfer crude oil and
gas; to prepare reporting system and how to claim if discrepancies
occurs in the transferring process in the point of sales more
than tolerable losses, consist of.
* Clarification and discussion about Losses and Gain during
production process, Crude Oil storage handling, Gas handling,
Transfer of crude oil and gas.
* Reporting system of the “Oil and Gas Losses�.
* Loss Management that will give solution how to reduce losses where
losses more then tolerable from time to time and evaluate causes
of losses, gain and shrinkage.
6. Offtake Procedure, Entitlement Calculation and Over (Under) Lifting
Monitor
* To learn how to calculate Entitlement each Parties in the
Production Sharing Contract,
* Prepare the Lifting and Pumping Monitoring base on BPMIGAS
Standard Report.
* Nomination procedure.
Â
PARTICIPANT
This Course should be attend and useful for Supervisor and Staff who
responsible the process and measurement production, transfer and
lifting at block station and terminal and also Staff who is in charge
handling Crude Oil Accounting and Shipping activities and staff who
handling Over (Under) Lifting Monitor and evaluation of nomination.
 Â
TRAINING METHODE
Presentation
Discussion
Case Study
Evaluation
JADWAL TRAINING TAHUN 2026
03 – 04 Januari 2026 | 16 – 17 Januari 2026
06 – 07 Februari 2026 | 20 – 21 Februari 2026
05 – 06 Maret 2026 | 19 – 20 Maret 2026
03 – 04 April 2026 | 23 – 24 April 2026
07 – 08 Mei 2026 | 21 – 22 Mei 2026
05 – 06 Juni 2026 | 25 – 26 Juni 2026
09 – 10 Juli 2026 | 23 – 24 Juli 2026
06 – 07 Agustus 2026 | 20 – 21 Agustus 2026
04 – 05 September 2026 | 18 – 19 September 2026
08 – 09 Oktober 2026 | 22 – 23 Oktober 2026
06 – 07 November 2026 | 26 – 27 November 2026
04 – 05 Desember 2026 | 18 – 19 Desember 2026
Metode Training
- Tatap Muka/offline
- Online via zoom
Kota Penyelenggaraan jika offline :
- Bandung
- Jogjakarta
- Surabaya
- Jakarta
fasilitas yang didapatkan
- Training Kit Eksklusif
- Tas
- Name Tag
- Modul
- Flash disk
- Ballpoint
- Block Note
- Souvenir
- Harga yang Reliable
- Trainer Kompeten di bidangnya
- Pelayanan Maksimal untuk peserta
- Penjemputan dari dan ke bandara
Investasi :
Public training : Rp. 4.500.000 (minimum 3 pax)
In House Training : on Call
